Our Projects
Barrow Island Geotechnic Diamond Drilling
Gorgon LNG Plant site geotechnical site investigation drilling program Phase 3.
Geotechnical drilling and testing;
Installation of groundwater monitoring bores and;
Subterranean fauna traps.
Drill Rig: 4
|
Barrow Island Mobilisation Picture 1 |
|
|
|
Drill Rig 4 shrink wrapped as part of the Barrow Island environmental quarantine requirement to get ready for transportation to commence the project.
|
|
|
|
Drill Rig 4 shrink wrapped as part of the Barrow Island environmental quarantine requirement to get ready for transportation to commence the project.
|
|
|
Barrow Island Mobilisation Picture 2 |
|
|
|
Mobilizing the site office to BWI site.
|
|
|
|
Mobilizing the site office to BWI site.
|
|
|
Barrow Island Mobilisation Picture 3 |
|
|
|
Hagstrom Drilling Site Office from which BWI operations were run.
|
|
|
|
Hagstrom Drilling Site Office from which BWI operations were run.
|
|
|
Barrow Island Mobilisation Picture 4 |
|
|
Further commitment to ensure quarantine requirement are met.
|
|
|
|
Further commitment to ensure quarantine requirement are met.
|
|
|
Barrow Island Picture 1 |
|
|
Drilling operations for the terrestrial drilling program in
the LNG footprint.
|
|
|
|
Drilling operations for the terrestrial drilling program in
the LNG footprint.
|
|
|
Barrow Island Picture 2 |
|
|
Lighting tower filled with shroud to control distribution of
light.
|
|
|
|
Lighting tower filled with shroud to control distribution of
light.
|
|
|
Barrow Island Picture 3 |
|
|
|
Fire fighting unit on site. On every drill pad as per requirement defined in contract.
|
|
|
|
Fire fighting unit on site. On every drill pad as per requirement defined in contract.
|
|
|
Barrow Island Picture 4 |
|
|
Highlighting HD commitment to BWI environmental policy.
Provision on site for waste segregation.
|
|
|
|
Highlighting HD commitment to BWI environmental policy.
Provision on site for waste segregation.
|
|
|
Barrow Island Picture 5 |
|
|
Example of Drill Site layout. Provision of shaded areas for
drill crew as part of HD heat stress management practices.
|
|
|
|
Example of Drill Site layout. Provision of shaded areas for
drill crew as part of HD heat stress management practices.
|
|
|
Barrow Island Picture 6 |
|
|
Further example of drill site layout. Great example of good
housekeeping practices.
|
|
|
|
Further example of drill site layout. Great example of good
housekeeping practices.
|
|
|
Barrow Island Picture 7 |
|
|
|
Part of the drilling process. Removing core sample from the drill string.
|
|
|
|
Part of the drilling process. Removing core sample from the drill string.
|
|
|
Barrow Island Picture 9 |
|
|
|
Rig Moves from hole to hole in the LNG footprint area.
|
|
|
|
Rig Moves from hole to hole in the LNG footprint area.
|
|
|