Hagstrom Drilling's goal is to become the leader of innovation in the industry through continual investment in new technology...

Hagstrom Drilling Projects

  • Lucinda Bulk Sugar Loader Facility

    Date:

    2012

    Client:

    • Abergeldie

    Services:

    Hagstrom Drilling's client, Abergeldie has been contracted to a fast track program of repair works to Queensland Sugar Limited’s 5 km long jetty and bulk sugar loader at Lucinda, 150 km north of Townsville.

  • Wheatstone Phase III - Onshore Project

    Date:

    2010

    Client:

    • Chevron

    Services:

    Chevron Wheatstone LNG near Onslow, Western Australia. Onshore plant site geotechnical site investigation drilling.

  • Wheatstone Phase III - Nearshore Project

    Date:

    2010

    Client:

    • Chevron

    Services:

    Nearshore geotechnical site investigation drilling program for the Chevron Wheatstone LNG project near Onslow, Western Australia.

  • Inpex Darwin - Phase 1 Nearshore Geotechnical Investigation

    Date:

    2009

    Client:

    • Inpex

    Services:

    Phase 1 of a nearshore geotechnical investigation.

  • Milyeannaup Wind Farm (Augusta)

    Date:

    2009

    Client:

    • Milyeannaup Wind Farm

    Services:

    Hagstrom Drilling where engaged to provide geotechnical drilling at the Milyeannaup Wind Farm site.

  • Maret Island Geotechnical Investigation

    Date:

    2009

    Client:

    • Inpex

    Services:

    Engaged by Inpex Corporation to provide geotechnical drilling on Maret Island for the proposed site of the Inpex Browse Ichthys gas field.

  • Gladstone Nearshore and Onshore Geotechnical Drilling

    Date:

    2012

    Client:

    • Bechtel

    Services:

    Hagstrom Drilling where engaged to provide geotechnical and environmental drilling services for a proposed APLNG site on Curtis Island Queensland by Bechtel and ConocoPhillips.

  • Woodside James Price Point Geotechnical Investigation

    Date:

    2011

    Client:

    • Woodside

    Services:

    Hagstrom Drilling was engaged by Fugro Geotechnics and Woodside to complete geotechnical drilling and cone penetration testing services on the proposed Woodside Gas Hub site at James Price Point.

  • North Queensland Bulk Ports Geotechnical Investigation

    Date:

    2011

    Client:

    • North Queensland Bulk Ports

    Services:

    Hagstrom Drilling was engaged by North Queensland Bulk ports to complete a nearshore geotechnical drilling and cone penetration investigation for a proposed loading facility in Bowen, North Queensland.

  • Roy Hill Geotechnical Investigation 2011

    Date:

    2011

    Client:

    • Roy Hill Infrastructure Pty Ltd

    Services:

    Hagstrom Drilling where engaged by Roy Hill Infrastructure Pty Ltd to perform geotechnical investigation on a proposed 300 km rail alignment project.

  • Ord River Geotechnical Investigation 2011

    Date:

    2012

    Client:

    • Mains Road WA

    Services:

    Mains Road WA geotechnical investigation at a proposed bridge site on the Ord River near Kununurra.

  • Solomon Railway and Minesite Geotechnical Investigation 2011

    Date:

    2011

    Client:

    • FMG

    Services:

    This two part project involved commencing work on the Solomon Railway Alignment project for FMG, with drill Rigs DR004, DR008 and DR011 completing approximately 650m of drilling.

  • Barrow Island Geotechnical Diamond Drilling

    Date:

    2009

    Client:

    • Gorgon

    Services:

    Hagstrom Drilling where engaged to provide services on the Gorgon LNG Plant site geotechnical site investigation drilling program Phase 3 on Barrow Island

  • Rio Tinto Iron Ore - Marandoo Mine Site

    Date:

    2009

    Client:

    • Rio Tinto Iron Ore

    Services:

    Hagstrom Drilling where engaged by RTIO to complete works on the Marandoo Mine Site.

  • Rail Bridge - Yandi Wye Bridge

    Date:

    2009

    Client:

    • BHP Biliton

    Services:

    Engaged by BHP Biliton to provide geotechnical drilling at the Yandi Mine for a proposed bridge crossing.

  • Inpex Darwin-Phase 2 Nearshore Geotechnical Investigation

    Date:

    2011

    Client:

    • Inpex

    Services:

    Phase two of this nearshore geotechnical investigation

  • Wellington Dam

    Date:

    2011

    Client:

    • Leighton

    Services:

    Engaged by Leighton who where preforming some repair work on the Wellington Dam wall.

  • Cape Lambert, Intertidal (Marsh Buggy) drilling

    Date:

    2011

    Client:

    • Rio Tinto Cape Lambert

    Services:

    This project was a challenging project from the perspective of having to work within the tidal constraints at Cape Lambert.

  • Perth Flying Squadron, Nedlands

    Date:

    2010

    Client:

    • Perth Flying Squadron

    Services:

    Engaged by the Perth Flying Squadron to complete four 30m HQ3 boreholes using rotary mud flush and a number of SPT's.