(+61) 08 9456 0595
Engaged by BHP Biliton to provide geotechnical drilling at the Yandi Mine for a proposed bridge crossing.
Project involved the drilling of twelve 25m HQ3 boreholes and was completed utilising drill rig DR006.
Back to projects