Barrow Island Geo technical Diamond

INTRO

Hagstrom Drilling where engaged to provide services on the Gorgon LNG Plant site geotechnical site investigation drilling program Phase 3 on Barrow Island.

Following extensive quarantine requirements for all equipment the project completed included geotechnical drilling and SPT testing, installation of groundwater monitoring bores and and subterranean fauna traps.

One drill rig (DR004) was utilised on this project.