Cape Lambert Intertidal (Marsh Buggy) Drilling

INTRO

This project was a challenging project from the perspective of having to work within the tidal constraints at Cape Lambert.  Engaged by Coffey Geotech and Rio Tinto, the difficult terrain suited the use of the Hagstrom Drilling Marsh Buggy which was configured with one of our Heliportable drill rig (DR010).

Just under 200 meters of PQ3 drilling was succesfully completed.