Rail Bridge -Yandi Wye Bridge BHP Biliton

Key Elements

Service: Geotechnical Drilling
Year: 2009
Client: BHP Billiton

INTRO

Engaged by BHP Biliton to provide geotechnical drilling at the Yandi Mine for a proposed bridge crossing.

Project involved the drilling of twelve 25m HQ3 boreholes and was completed utilising drill rig DR006.