Rio Tinto Iron Ore- Mirandoo Minesite

Key Elements

Service: Geotechnical Drilling
Year: 2009
Client: Rio Tinto

INTRO

Hagstrom Drilling where engaged by RTIO to complete PQ- 3 drilling, Shelby tube sampling and; EFCPT testing on the Marandoo Mine Site.  This was completed utilising drill rig DR006.